eu-2026-1744/art_001/pt_030
op replace · level paragraph · enacting-terms position (30) · in force 2026-07-27
The instruction (quoted official text)
in Article 72, paragraph 3 is replaced by the following:
Quoted payload (official replacement/inserted text)
3.The post-market monitoring system shall be based on a post-market monitoring plan. The post-market monitoring plan shall be part of the technical documentation referred to in Annex IV. The Commission, taking utmost account of the opinion of the Board, shall adopt guidance, including a template, on the post-market monitoring plan by 2 September 2027.;
Provenance
| link | value |
|---|---|
| payload xml sha256 | 8ad473d594e0e617e56f982bb85a4848a4e46dab29bf853d73dd15e1c63c2fa7 |
| OJ Formex member | L_202601744EN.000101.fmx.xml |
| CELLAR / CELEX | 32026R1744 |
| target resolution | grammar over enacting terms; cross-checked against payload Formex IDENTIFIER attributes where present (parser-derived) |
Affected provisions
eu-2024-1689/art_072/par_003 amended
BEFORE (as published)
3. The post-market monitoring system shall be based on a post-market monitoring plan. The post-market monitoring plan shall be part of the technical documentation referred to in Annex IV. The Commission shall adopt an implementing act laying down detailed provisions establishing a template for the post-market monitoring plan and the list of elements to be included in the plan by 2 February 2026. That implementing act shall be adopted in accordance with the examination procedure referred to in Article 98(2).
AFTER (composed current text)
3. The post-market monitoring system shall be based on a post-market monitoring plan. The post-market monitoring plan shall be part of the technical documentation referred to in Annex IV. The Commission, taking utmost account of the opinion of the Board, shall adopt guidance, including a template, on the post-market monitoring plan by 2 September 2027.
WORD-LEVEL DIFF
3. The post-market monitoring system shall be based on a post-market monitoring plan. The post-market monitoring plan shall be part of the technical documentation referred to in Annex IV. The CommissionCommission, taking utmost account of the opinion of the Board, shall adopt anguidance, implementing act laying down detailed provisions establishingincluding a templatetemplate, foron the post-market monitoring plan and the list of elements to be included in the plan by 2 FebruarySeptember 2026. That implementing act shall be adopted in accordance with the examination procedure referred to in Article 98(2).2027.
Check this and report · derivation.json
How to check: compare the quoted instruction and payload above (hash-anchored to the OJ Formex bytes) against the BEFORE/AFTER panes. Two minutes, one provision. Then file the result — "checks out" is worth recording too.